News

Travel Disruption – A39 Solar Farm

Upcoming street works will be getting underway in the Marksbury/Farmborough area over the coming weeks and months, in connection with the new solar farm at Marksbury Plain.

 

Main dates to note:

1. Along the A39 from the New Inn Pub, to the Junction between A39 and Timsbury Road. These works are scheduled to take place under temporary signals/lights from 4 to 27 March.

2. Closure of Timsbury Road between A39/Timsbury Road Junction, and Timsbury Road/Priston Lane Junction. These works are scheduled to take place from 28 March to 19 April.

3. Closure of Priston Lane between Timsbury Road Junction to the entrance of Castle Farm. These works are scheduled to take place from 22 April to 7 June.

4. Along Priston Lane between the Timsbury Road Junction up to Conygre Brook. These works are scheduled to take place under temporary signals/lights from 8 July to 7 August.

 

Here is a link to the European Energy Website that gives full details of the Marksbury Plain Solar Farm works.     European Energy Website.


Leave a Reply

Your email address will not be published. Required fields are marked *